Where Work Orders Come From
- Raised by hand from the Work Orders list, for any task (see below)
- Promoted from an issue when a reported problem needs work
- Raised automatically at the 7-day compliance threshold to renew a lapsing certificate (see Reminders)
- Raised on cadence by a PPM schedule
Raising a Work Order by Hand
Editors can raise a work order straight from the list, without an issue or a compliance finding behind it.1
Start a new row
Click + New Work Order at the bottom of the Work Orders grid. You can also choose New Work Order from the quick actions in Cmd K, which takes you straight to that row.
2
Type a title
Type what needs doing and press Enter.
3
Pick a site
Choose the site. If you’re scoped to one site, it’s already filled in.
Numbers and Statuses
Each carries a number (WO-0001), title, priority (low / medium / high / emergency) and status: Open → Scheduled → In progress → On hold → Completed / Cancelled.Competence Gating
When you assign a contractor, Proprietas checks their competence certificates (Gas Safe, NICEIC, SafeContractor, CHAS). If one has expired, the assignment can be blocked until it’s refreshed, so an out-of-ticket contractor never ends up on a gas job. See Contractors.Tendering and Quotes
For organisations that need competitive quotes, as charity trustees and MATs often do, a work order can require a minimum number of quotes before it’s accepted. Contractors submit quotes; you accept one. Accepting below the quote threshold requires a written override reason, which is recorded. Multiple quotes live on the work order, with one accepted at a time; a superseded quote stays in the history.Payments
Log payments against a work order (deposit, milestone, final), each with amount, method, reference and an optional invoice. Payments can be voided without losing the audit history, so the financial trail is always intact.Conversation
Every work order carries a threaded conversation between your team and the assigned contractor. Comments appear in the work order’s side panel and full page on your side, and in the contractor portal on theirs, so “when can you attend?” and the answer live on the job itself instead of in someone’s inbox. New replies arrive in real time.Closing the Loop
When work is done, the contractor marks it complete, often through the portal, uploads any certificate or report, and the linked issue or obligation updates. Every status change and comment is logged.The contractor portal
How contractors do all this without an account.